New Search
Photo Search
Audiovisual Search
Jewish Community Centre Bloor "Y" Branch feasibility study
- Part Of
- Jewish Community Centre of Toronto fonds
- Executive director series
- Architectural plans sub-series
- Level
- File
- ID
- Fonds 61; Series 1-3; File 4
- Source
- Archival Descriptions
- Part Of
- Jewish Community Centre of Toronto fonds
- Executive director series
- Architectural plans sub-series
- Level
- File
- Fonds
- 61
- Series
- 1-3
- File
- 4
- Material Format
- textual record
- architectural drawing
- Date
- 1981
- Physical Description
- 1 cm of textual records (1 v.)
- 8 architectural drawings : proposal ; 28 x 43 cm folded to 28 x 22 cm
- Scope and Content
- This file consists of a study conducted by A.J. Diamond & Partners, Architects & Planners and A.J. Vermeulen, Quantity Surveyor on the feasibility of modifying the Bloor building to accommodate the new demands made on the athletic, school and community space. The study includes information on demographics of the surrounding area, program analysis and renovation/addition options. There are eight accompanying drawings of the proposed modifications, prepared by the architects.
- Accession Number
- 2004-5-2
- Source
- Archival Descriptions